Karenge Drinking Water Supply System
Coordinate location2°13′8″S 30°27′50″E Edit
Map

Karenge Drinking Water Supply System (KDWSS), wey dem dey call am Karenge Water Supply System too, be water intake, water treatment, den water distribution system for Rwanda. De system dey supply water give some parts of de capital city, Kigali, plus de neighboring Rwamagana District.[1]

Location

[edit | edit source]

De water treatment den distribution facility dey for de lakeside community wey dem dey call Karenge, Rwamagana District, for Eastern Province of Rwanda, for de shore of Lake Mugesera. E dey about 50 kilometres (31 mi) by road southeast from Kigali, de national capital.[1]

Overview

[edit | edit source]

Dem establish KDWSS for 1975 plus processing capacity of 3,840 cubic metres (135,608 cu ft) every day. For 1985, dem increase de capacity go 7,200 cubic metres (254,266 cu ft) every day. For 2008, de daily output increase reach 12,000 cubic metres (423,776 cu ft). As of October 2020, de system dey produce 15,000 cubic metres (529,720 cu ft) clean drinking water every day. Out of dat amount, 12,000 cubic metres (423,776 cu ft) (80 percent) dey go through pipeline enter Kigali, while 3,000 cubic metres (105,944 cu ft) (20 percent) dem dey distribute inside Rwamagana District.[2]

Expansion

[edit | edit source]

For 2020, Rwanda government, through ein subsidiary Water and Sanitation Corporation (WASAC Limited), decide say dem go increase de processing capacity of dis plant go 48,000 cubic metres (1,695,104 cu ft) every day.[1][2] De expansion work include:[1]

  • Upgrade de raw water source
  • Build new raw water intake pumps
  • Upgrade de raw water intake pipes
  • Move de intake pumping station go new location
  • Improve de capacity of de motors den pumps
  • Build new drinking water storage tanks
  • Expand de drinking water transport den distribution network by laying 33 kilometres (21 mi) of new distribution pipes.[1]

Construction den funding

[edit | edit source]

De estimated cost for de expansion be US$164.3 million. De organizations below dey provide money for de construction.[1]

Karenge Water System Expansion Funding
RankDevelopment PartnerContribution in USDPercentageNotes
1OPEC Fund for International Development (OFID)21.0 million12.8Loan[1]
2Abu Dhabi Fund for Development (ADFD)Loan[1]
3Saudi Fund for Development (SFD)Loan[1]
4Arab Bank for Economic Development in Africa (BADEA)Loan[1]
5Exim Bank of Hungary52.031.6Loan[3]
Total164.3 million100.00

Other considerations

[edit | edit source]

De expanded plant be part of de Rwanda authorities dema plan make 100 percent of everybody for de country get access to clean drinking water by December 2024.[1][2][3]

References

[edit | edit source]
  1. 1 2 3 4 5 6 7 8 9 10 11 Inès Magoum (13 November 2023). "Rwanda: The capacity of the Karenge water plant will be tripled with $2M from OFID". Afrik21.africa. Paris, France. Retrieved 16 November 2023.
  2. 1 2 3 Mininfra (7 October 2020). "Government To Increase Production Capacity off Karenge Water Treatment Plant And Strengthen Its Distribution Network". Rwanda Ministry of Infrastructure (Mininfra). Kigali, Rwanda. Retrieved 16 November 2023.
  3. 1 2 Mike Kubwa (29 September 2023). "$52 Million to be Utilized in Karenge Water Treatment Plant Upgrade in Rwanda". Construction Review Online. Nairobi, Kenya. Retrieved 16 November 2023.
[edit | edit source]