Sunon Asogli Thermal Power Station, dem sanso know as Asogli Thermal Power Stationn, be 560 MW natural gas thermal power station for Ghana.[1] Sunon Asogli Power Ghana Ltd own am, wey na e be first private light generation plant for Ghana history.[2] De station dey among top five power plants for Ghana.

For October 2024, Sunon Asogli Power Ghana Ltd suspend demma 560MW plant from October 8, say ECG no pay money wey dem owe.[3] By September 2024 end, ECG owe about US$259m (fuel no count), debt go up 23% since January, but dem only pay like 22.6% through Cash Waterfall Mechanism.

Location

[edit | edit source]

E dey Kpone area for Tema port city, about 35km road from Accra central. Sunon Asogli Thermal Power Station dey for coordinates: 05°40'49.0"N, 0°02'50.0"E (Latitude: 5.680278; Longitude: 0.047222).[4]

International Collaborations

[edit | edit source]

Togbe talk say development no for dey depend only on government. E add say Ghana for use international resources and expertise make progress.[5]

Overview

[edit | edit source]

De power station start work 2010, Sunon Asogli Power Ghana Ltd own am. De table below dey illustrate de shareholding insyd de stock of Sunon Asogli Power Ghana Limited.[6]

Sunon Asogli Power Ghana Limited Shareholding
Rank Name of Owner Percentage Ownership
1 Shenzhen Energy Group Limited   60.0
2 China-Africa Development Fund 40.0

Dem build de power station in phases. Sunon Asogli Power Ghana Ltd own am, and e be first private light generation plant for Ghana history.[7]

Expansion

[edit | edit source]

De table show de three phases wey dem take build de power station. After Phase One, dem do Phase Two then Phase Three one after de other.[7]

Phased Construction of Sunon Asogli Thermal Power Station
Phase Installed MW New Capacity MW Year dem plete
1 200  200 2010
2 180 380 2016
3 180 560 2018

For April 2020, Sunon Asogli Power Station plus Ghana Grid Company finish fix 330/161 KV interconnect Auto Transformer for de station. De new switchgear make dem fit carry more light wey loss go reduce. De project cost US$5.4m — Sunon Asogli Power put US$2m, Ghana Grid Company pay de rest.[8]

Sanso spy

[edit | edit source]

References

[edit | edit source]
  1. "Dumsor looms as Sunon Asogli shuts down 560MW power plant over $259 million debt owed by ECG". Modern Ghana (in English). Retrieved 2025-07-10.
  2. "Sunon Asogli Power shuts down due to $259m debt owed by ECG - MyJoyOnline". www.myjoyonline.com (in American English). Retrieved 2025-07-10.
  3. "Sunon Asogli Power Plant Shuts Down". DailyGuide Network (in American English). 2024-10-17. Retrieved 2025-07-10.
  4. "Sunon Asogli Thermal Power Station - Ghana". www.indexmundi.com. Retrieved 2024-10-16.
  5. "International Collaborations". www.togbeafede.com. Retrieved 2024-10-16.
  6. CitiFMOnline.com (9 January 2013). "Asogli Power Plant To Become Electricity Exporter By 2016". Modernghana.com. Retrieved 30 June 2020.
  7. 1 2 Bonface (12 June 2015). "Asogli Power in Ghana resumes power generation". Nairobi: Construction Review Online. Retrieved 30 June 2020.
  8. Africa Energy Portal (27 April 2020). "Ghana: GRIDCo and Sunon Asogli build $5.4m Auto Transformer to boost power supply". Africa-Energy-Portal.Org. Retrieved 30 June 2020.
[edit | edit source]